
Sonas Refuge Centre, Blanchardstown
Project Scope of Work:

- Supply, installation and commissioning of a centralised boilerhouse which provides geothermal underfloor heating through teh use of a ground source heat pump to the office/social block. Underfloor heating circuits in the office/social block and a heat recovery AHU which fed from the geothermal LPHW circuit.
- Supply, installation and commissioning Soils & Wastes,HWS,HWSR,CWS boosted,LPHW circuits via underground to a separate residential block. Kitchen extract system, extract fans and associated ductwork. Heat Recovery AHU serving the administration area.
- Supply, Installation and commissioning of BMS for the control and monitoring of all mechanical services.
| Location: Blanchardstown, Dublin Contract Value: €245,000 Client: Sonas Housing Association M/E Consultant: Dervan Engineering Architect: Cathal Crimmins Architects Quantity Surveyor: Walsh Maguire & Co ltd Main Contractor: Walsh Maguire & Co ltd | Start Date: May 2008 Completion Date: February 2009 Project Manager: Stephen Keane Peak Manpower: 8 Method of Procurement: Tender |
Architects Elevations
Tritech Engineering Ltd, Unit E1 South City Business Park, Tallaght, Dublin 24. Phone: (01) 4131000

